Downer PipeTech was engaged by Rio Tinto to renew three corrugated steel arch bridges in WA. The project involved the installation of a stand alone structural lining to the inside of an existing 3 [...]
Pipe bursting | Canberra Avenue, ACT
Downer PipeTech Media2024-02-15T11:43:06+11:00Working with Icon Water, Downer PipeTech was engaged to renew a 6.7 km section of existing (CICL) Cast Iron main pipe in Canberra Avenue, ACT. The system upgrade utilised pipe bursting technology to install [...]
Renewal of Water Main | Liverpool, NSW
Downer PipeTech Media2024-02-15T11:43:53+11:00Downer PipeTech was engaged by Sydney Water to renew the existing (CICL) Cast Iron main on Elizabeth Drive, Liverpool. The system upgrade included slip lining of 875m of DN400 PE main, to be installed [...]
Berolina-CIPP | Wombarra, NSW
Downer PipeTech Media2024-02-15T11:44:51+11:00Downer PipeTech was engaged by Sydney Trains to repair a 27 metre long brick arch culvert. The need for remediation of this culvert was due to the brick arch that was starting to crack [...]
Civil Maintenance | Myoora Rd Terry Hills, NSW
Downer PipeTech Media2024-02-15T11:57:21+11:00Downer PipeTech was engaged by Sydney Water Corporation to undertake upgrade works to the existing sewer infrastructure at Myoora Road, Terrey Hills. The system upgrade included directionally drilling a 2km section of (HOPE) pipe [...]
Point-lining | Parramatta Rd Camperdown, NSW
Downer PipeTech Media2024-02-19T12:50:45+11:00Ventia Boral Amey Joint Venture (VBAJV) engaged Downer PipeTech to undertake investigation works and drainage rehabilitation to the intersection of Parramatta Road and Missenden Road, Camperdown. During the CCTV inspection and cleaning, it was [...]
Point-lining | Holsworthy, NSW
Downer PipeTech Media2024-02-15T11:54:41+11:00Downer PipeTech was engaged to rectify defects within newly constructed storm water network as part of the Holsworthy Army Barracks relocation project. Construction defects were identified in their new storm water network and Downer [...]
Slip-lining | Luna Park, NSW
Downer PipeTech Media2024-02-15T11:55:54+11:00Sydney Trains has identified that the sandstone culvert at Lavender Bay was in need of an urgent repair. Whilst the culvert was in a fair condition structurally, there were numerous leaks and a high [...]
Berolina-CIPP | Northern Beaches Council, NSW
Downer PipeTech Media2024-02-19T13:17:51+11:00Downer PipeTech was engaged by Northern Beaches Council to undertake the repair and remediation works to Stormwater infrastructure within the private property along the Manly waterfront. Specific considerations that were sensitive to this site [...]
Slip-lining | Springfield Parkway, QLD
Downer PipeTech Media2024-02-19T14:31:04+11:00Downer PipeTech was engaged to rehabilitate a pipeline designated as Pipe 3 of the Ipswich trunk watermain augmentation project within the Springfield water supply network. The project involved the slip-lining and replacement of a [...]
Pressurelining | Walter Road, WA
Downer PipeTech Media2024-02-15T12:01:37+11:00The Walter Road project was a design & construct contract for the renewal of a 2km section of DN460RC distribution water main located in Perth from the intersection of Beechboro Road and Walter Road [...]
Sewer Extension | Beacon Hill, NSW
Downer PipeTech Media2024-02-19T15:18:43+11:00Sydney Water’s Delivery Management team has recently completed a service extension to connect properties at Beacon Hill to the existing wastewater system. Sydney Water’s Site Supervisor Tim Kay made note that he has received [...]
Berolina-CIPP & Tunneline | Mt Ousley, NSW
Downer PipeTech Media2024-03-12T09:48:56+11:00Combining traditional tunneline technology with modern day rehabilitation techniques enabled Downer PipeTech to submit and provide a solution to RMS [Roads and Maritime Services] to extend the life of an existing set of culverts [...]
Tunneline | Oodla Wirra, SA
Downer PipeTech Media2024-03-12T09:50:05+11:00Downer PipeTech was engaged by Transfield Services, who are the facilities manager for ARTC to design and install structural solution to this under track culvert that was showing advanced signs of decay with large [...]
Slip-lining | North Burdekin, QLD
Downer PipeTech Media2024-02-19T12:59:16+11:00Downer PipeTech were engaged by the North Burdekin Water Board to rehabilitate two reinforced concrete pipelines that delivered water from The Rocks pump station, alongside the Burdekin River into Sheep Station Creek. The two [...]
Pressure lining | Adelaide CBD
Downer PipeTech Media2024-02-19T15:34:18+11:00Downer PipeTech offer Pressure lining (formerly Swagelining™) as a rehabilitation process for the renewal of pressure and non-pressure pipelines in water, sewer and industrial applications. This is the second project for SA Water having [...]
Berolina-CIPP | Kiama Bends, NSW
Downer PipeTech Media2024-02-19T12:54:00+11:00The NSW Roads & Maritime Services (RMS) had identified that two 60 metre 900mm corrugated steel culverts under the Princes Highway at the Kiama bends needed to have the structural integrity of the culverts [...]
Pipe Bursting | Blue Mountains, NSW
Downer PipeTech Media2024-02-19T13:13:13+11:00This project involved the upsizing of the existing sewer network within the community of Blackheath using pipe bursting techniques. The objective of the project was to replace the sewer lines with upsized pipes to [...]
Robotics | Sydney Olympic Park, NSW
Downer PipeTech Media2024-02-16T11:16:17+11:00The Sydney Olympic Park Complex is served by a comprehensive storm water drainage system that covers all road, parkland and building drainage needs for the site. Apart from the system serving the Newington area, [...]